Waltrop - Methane 1
Drilling cut-through.Lining works in the context of pipe installation were successfully completed on the 7th of February 2005.
Site shut-down (due to a lack of gas)
|
|
|
Waltrop - Methane 1Drilling cut-through.Lining works in the context of pipe installation were successfully completed on the 7th of February 2005. Site shut-down (due to a lack of gas) |
|
|
|
|